| Update. 29th Aug. Terry visited Cranmore on Tuesday 24th August and took some pictures of the latest progress on the loco.
Their top welder, Jeff, is seen in action! Since the previous set of pictures, the No.2 cab roof fixings have been repaired and it will not now be necessary to remove the fibreglass roof section at that end. The cab floor together with the front and side structure on the secondmans side are now being attended to. As Jeff proceeds onwards, another member of the CTMS team, Mike, is seen following on filling and undercoating in preparation for painting. |
|||||
![]() |
|||||
![]() |
|||||
![]() |
|||||
![]() |
|||||
![]() |
|||||
![]() |
|||||
![]() |
|||||