33057 Update 12th September

Not much progress to report this weekend due to the shed being open to the public as part of the Late Summer Weekend.
Some plain brass screws were obtained and Brad was able to attach the polished brass rings to the engine instrument panel fascia that he has restored.
He was justifiably pleased with the result and it was placed into position to get the full effect.
The replacement vent pipe between the turbo charger oil seperator and exhaust stack has been manufactured and fitted during the past week.